Starting Built-In’s and Fixing Fireplace

Jun 27

When we walked through today there were more updates 🙂  The fireplace had been fixed – they cut the tile and patched up the sides.  And the trimmer had started on the built-in’s.  We can’t believe there’s only 3 weeks to go! Hopefully it all comes together!

1

Crown Molding finished in kitchen above cabinets.

2

Joe’s barn clothes built-in starting to come together for the laundry room.

3

Here’s the top part of it. There will be hooks in the big opening.

4

Master bath hardware on – oil rubbed bronze.

5

Sink faucet on.

6

Window seat built in starting to form 🙂 The holes are to let the vent air out  (because there are vents below there).

7

Fireplace fixed!  The white mantle will go down the sides and across the top.